Welcome to the Administratively Determined Incentive Program (ADI) which is now open to new registrations. All ADI Registrations are required to be submitted through this registration portal. This portal will allow you to enter a registration, save and update registration information, upload the required ADI Registration documents, and check the status of your ADI registration(s) at any time.

When entering your first registration, you will be prompted to set up a secured log-in and profile. The log-in will be required to submit additional registrations or to view the status of a registration. ALL correspondence will be sent via email to the designated parties listed under the Premise, Primary and Solar Contractor section of the online portal. Hard copy letters will not be issued.

If you currently have a log in that was used in the previous SREC Registration Program (SRP), or Transitive Incentive Program (TI) you can use the same log in for the ADI Registration online portal.

Administratively Determined Incentive (ADI) Program provides administratively set incentive values for net metered residential projects, net metered non-residential projects of 5MW or less, all community solar projects, and, for an interim period, projects previously eligible to seek conditional certification form the Board under Subsection (t). Net Metered Non-Residential Solar facilities that participate in the ADI Program cannot exceed 5MW dc (5,000 kW) in size.

ADI Capacity Blocks by Market Segment

The ADI Program will accept new registrations on a first come, first serve basis unti lthe megawatt block for that market segment is fully subscribed or until June 1, 2022, whichever comes first. When the megawatt block has been fully subscribed, the ADI Program Manager will close the registration portal to new registrations for that market segment and any new registration will no longer be accepted under that market segment. There will not be a waiting list for projects seeking to enter a capacity block for a particular market segment that is already fully subscribed.

The table will be updated on a regular basis to track available capacity for each market segment.

 

Market Segment Capacity Block (dc) Capacity Subscribed (dc) Capacity Available (dc)
Net Metered Residential 150,000 kW 37,285.16 kW 112,714.84 kW
Net Metered Non-Residential 150,000 kW 306.89 kW 149,693.11 kW
Community Solar (Non-LMI and LMI) 150,000 kW 0 kW 150,000 kW
Interim Subsection (t) Grid 75,000 kW 0 kW 75,000 kW

 


 

 